At BFT Mastclimbing, they believe contractors are spending huge sums of money needlessly on scaffolding for projects that can be done far more efficiently with Mastclimbers. This is mainly due to a lack of awareness and the below aims to demonstrate many of the benefits of using BFT Mastclimbing on brickwork projects.
Project: Wales Farm Road
Contractor: Ardmore
Brief: Order placed for Block 9 (9 Floors), Block C (31 Floors) and Block D (11 Floors) knowing that Mastclimbers would be significantly cheaper than using scaffolding. Due to the exceptional progress that was made, Block E (5 Floors) was then also added to the order and completed using BFT Mastclimbers.
The program was completed early (combined total of 360 weeks across the positions), saving a further £86,000 against original quote and over 60% cheaper than what the cost of scaffolding would have been.
Additional benefits:
• Ties can be planned to avoid brickwork areas allowing for 100% completion.
• Significantly less ties required for Masts when compared to scaffold.
• Drop down flaps can be added to close internal gaps as façade builds.
• Platform driven to optimal working height all of the time ensuring maximum productivity by trades with less accidents and injuries.
• Safe Working Loads and machine types can be structured to suit.